ZK Mechanical
Request a free quote
What do you need? Pick everything that applies

Free quote, in writing, no obligation. Or just call (647) 801-1252, 24/7.

Home / Services / Commercial HVAC / Commercial HVAC Design-Build

Commercial · Commercial HVAC Design-Build

Commercial HVAC Design-Build for Small Buildings

Commercial HVAC design-build for small buildings puts the drawings, the permit, the installation and the commissioning under one contract and one price, instead of hiring an engineer, tendering the drawings and managing a contractor yourself. In Ontario the drawings must come from a qualified designer: a BCIN-registered designer for small buildings, and a professional engineer once the building is over 600 m² in gross area or over three storeys. It suits single-tenant buildings, plaza units and industrial condos where the owner wants one party answerable for whether the system works.

Reviewed by Zobir, licensed technician

TSSA-licensedMaintenance contracts24/7 emergencyPer-unit reporting

Ontario law decides who may draw the system before anyone decides what the system is. Under the Building Code Act, a person who prepares a design for a permit must be qualified and registered with the province, which is where the BCIN (Building Code Identification Number) comes from; for mechanical systems in buildings other than houses, the qualification category is Building Services. Past 600 m² of gross area or three storeys, and for most assembly and care occupancies at any size, the design and the general review during construction go to a professional engineer. You should know at the first meeting which side of that line your building sits on, because it changes both the cost and the timeline.

A permit-ready mechanical design has four parts. First, a load calculation for the actual building (walls, glass, roof, people, lighting and equipment) and not a rule of thumb per square foot. Second, ventilation rates to ASHRAE 62.1, which the Ontario Building Code uses for outdoor air in non-residential spaces and which sets a different rate for an office, a sales floor and a classroom. Third and fourth, proof of compliance with Supplementary Standard SB-10, the Code's energy-efficiency standard for buildings other than houses, and the equipment schedule and duct layout the plans examiner reviews.

Owners pick design-build for accountability and speed. On the traditional route you pay an engineer for drawings, tender them to several contractors, and referee when the installer says the drawings do not fit the building. With one contract, the people who size the rooftop unit are the people who have to crane it, pipe the gas and make it hold temperature in July. The design gets checked against the real roof structure, gas meter and electrical service before the price is set.

Design-build is the wrong tool for some jobs, and it saves time to say so. A like-for-like rooftop replacement needs no new design; that is ordinary commercial HVAC installation. A large or publicly funded project usually wants an independent engineer and a competitive tender, and on those we price the engineer's drawings as a trade, which our page for general contractors explains.

Price is driven by tonnage, the number of zones, how much ductwork is new, gas and electrical capacity, crane access and whether an engineer's stamp is required. You get a fixed written price for the whole scope once the load calculation is done. Permits go through the building department where the building stands (City of Burlington, Town of Oakville, Town of Milton, City of Hamilton, City of Mississauga), each with its own intake and review queue. Read the commercial HVAC overview for how we run installations, or send us the address and whatever drawings exist.

Equipment we install and service

Rooftop units sized from the load

Gas-electric or heat pump packaged units selected from the calculated load, not from what the last building of this size had. Selection includes the economizer, the curb, the weight on the roof structure and the electrical and gas each unit needs.

Ductwork and air distribution

Supply and return layout by zone, diffuser selection, and duct sized so the unit's fan can deliver design airflow against the static pressure of the finished system. Most comfort complaints in small commercial buildings trace back to this sheet of the drawings.

Ventilation, exhaust and heat recovery

Outdoor air for each space to ASHRAE 62.1, washroom and janitor-room exhaust, an energy or heat recovery ventilator where SB-10 calls for one or the payback justifies it, and make-up air for any process or kitchen exhaust.

Controls and commissioning

Thermostats or a small networked control system with occupancy schedules and setbacks, then start-up sheets and an air balance report showing measured airflow against design at every diffuser. Commissioning is the part of design-build that proves the design.

What goes wrong in these buildings

  • I have a shell building and three contractors who each quoted a different size of unit.
  • The engineer's drawings came in over budget and nobody will take responsibility for redesigning them.
  • The City sent my permit application back asking for mechanical drawings and the designer's BCIN.
  • The installer blames the drawings, the engineer blames the installer, and the back office is still 27°C.
  • I changed the use from warehouse to offices and was told the ventilation no longer meets Code.
  • I need one fixed number for the bank before construction starts.

How it works

1. Survey and load calculation

We measure the building or take it off the architectural drawings, confirm the use of every room, and check the roof structure, gas meter and electrical service. The load calculation and ventilation schedule come out of that visit.

2. Drawings, permit and a fixed price

Mechanical drawings are prepared by a qualified designer: BCIN-registered for small buildings, a professional engineer where the Code requires one. You receive one written price covering design, permit application, equipment, installation and commissioning, with exclusions listed.

3. Install, commission and hand over

Gas work is done by TSSA-licensed technicians, electrical connections by a licensed electrical contractor under an ESA permit, and the building inspector signs off the mechanical. You get the balance report, start-up sheets, manuals and warranty dates in one binder.

Common questions

Do I need an engineer for a small commercial building in Ontario?

Not always. For offices, shops and low-hazard industrial buildings at or under 600 m² in gross area and three storeys, a designer holding a BCIN with the Building Services qualification can prepare the mechanical drawings. Above either limit, and for most assembly and care occupancies whatever the size, a professional engineer must design the system and review construction. The building department confirms which applies.

Does replacing a rooftop unit need a design and a permit?

A like-for-like replacement, same location, similar capacity, same fuel, generally needs no new mechanical design, and building departments differ on whether they want a permit for it. Changing capacity or fuel, adding units, running new ductwork or changing the use of the space is a material alteration and does need one. We check with the municipality before the price is final.

What is SB-10 and why does it affect my equipment choice?

SB-10 is the Ontario Building Code's supplementary standard for energy efficiency in buildings other than houses. It sets minimum efficiencies for heating and cooling equipment and requires features such as economizers on larger cooling units and controls that set back when the building is empty. A design that ignores it is returned by the plans examiner, so compliance is settled on paper before equipment is ordered.

Is design-build cheaper than hiring an engineer and tendering?

Sometimes, but price is not the main reason to choose it. You avoid a separate design contract and the redesign loop when tenders come in over budget; you give up competitive bids on finished drawings. Rule of thumb: one owner, one defined use and a small building favours design-build. Several stakeholders, public money or complex systems favour an engineer and a tender.

Related

Keep the building running.

One licensed team for installs, maintenance contracts and 2 AM calls.